FROM OUR PROJECT COLLECTIONSpecify the new assembly beyond its covering
A commercial reroof proposal should connect the selected covering to insulation, attachment, roof edges and flashing at equipment or walls. Drainage work should be identified separately enough that the owner can see whether it is included. If removal exposes damaged decking, ask how the findings and additional repair will be handled. Product names alone cannot describe these responsibilities. Keep the complete work description consistent with the documents provided for project review, including any changes in materials or related components made after the initial proposal. That consistency helps the building manager follow the work through completion.


